DRIVEWAY AND NEW PARKING

The driveway was a ten foot wide easement over another property. It had not been maintained for over thirty years. The surface had been grown in by crab grass.

The job was to clear and resurface this driveway with natural materials and to create an oversized parking area.

The base was crushed gravel for durability. It was then covered over with pea stone.

 
Gallery: Driveway
Driveway Before-01 Driveway Before-02 Driveway Before-03
Driveway Before-04 Driveway Before-05 Driveway Before-06
Driveway Before-07 Driveway-01 Driveway-02
Driveway-03 Driveway-04 Driveway-05
Driveway-06 Driveway-07 Driveway-08
Driveway-09 Driveway-10